32 Case Studies Across Healthcare, Education and Public Buildings
Scope, constraints and outcome for recent healthcare, education, public and commercial projects.
Healthcare 10 projects
Ealing Hospital CDC
Full mechanical and BMS installation for a new community diagnostic centre serving MRI, CT and X-ray, with over ten contract lifts and zero accidents on site.
Read the case study
£1.5 millionCharing Cross 3T MRI Suite
The full mechanical installation for a new 3T MRI suite, phased in a live hospital and completed with zero incidents.
Read the case study
£1.1 millionAshurst Hospital
A comprehensive mechanical and electrical services upgrade as main contractor for University Hospital Southampton NHS Foundation Trust.
Read the case study
£1 millionNorthwick Park Hospital Roof Works
A major programme of roof replacement, repairs and associated M&E enabling works as main contractor in a live hospital.
Read the case study
£800kThe Linden Centre
Three plant rooms renewed, a new external plant room built and 30 anti-ligature air conditioning units installed in a fully operational mental health hospital.
Read the case studyRoyal Berkshire Hospital Endoscopy
Ventilation, air conditioning, heating, domestic services, medical gases and BMS for a refurbished endoscopy department in a live hospital.
Read the case study
£350kCharing Cross MRI 2
Mechanical services for the refurbishment of the North Wing Radiology 1.5T MRI suite for Imperial College Healthcare NHS Trust.
Read the case study
£350kThe Derwent Centre
Replacement of heating and hot water plant as main contractor in a live mental health hospital.
Read the case study
£130kRare Dementia Support Centre
Heating, domestic water and above-ground drainage pipework for the Rare Dementia Support Centre at UCL.
Read the case study
£80kThe St Aubyn Centre
Essential plant replacement and associated mechanical and building works as main contractor at an NHS mental health facility.
Read the case studyEducation 17 projects

Minster in Sheppey Schools
An outdated one-pipe heating system removed across the Upper and Lower Schools and replaced in an eight-week programme, with heat on in time for winter.
Read the case study
£1.1 millionGoldsmiths Energy Centre
A new modular boiler plant in a sub-ground energy centre, delivered with temporary plant and zero operational downtime across the campus.
Read the case studyGrove Road School
Heating and mains hot and cold water systems replaced across three school buildings during the holidays, on time and within budget.
Read the case study
£700kSt Claudine's Heating Distribution
Heating and hot and cold water distribution pipework replaced in the Our Lady's Wing inside a demanding six-week holiday programme.
Read the case study
£1.1 millionSt Claudine's Fire Doors
A comprehensive fire door replacement programme, from survey and design through manufacture and installation to digital compliance records.
Read the case study
£692,153Laurel Park School
A full heating and mechanical services upgrade in a live school: plant room renewal, phased radiator replacement and BMS upgrade over ten weeks.
Read the case study
£650kQueen Elizabeth's School
M&E upgrades and refurbishment of the Tech Block as main contractor and lead designer, with new MVHR and four VRF systems.
Read the case study
£540kLa Sainte Union School
Two plant rooms refurbished and joined into one network by new underground pipework, with the school kept fully operational for six months.
Read the case study
£350,000Westcliff High School for Boys
A service and maintenance contract awarded after the heating replacement, renewed for a second year, plus refurbishment of the historic main hall.
Read the case study
£300kHadley Wood Primary School
Full strip-out and replacement of the main plant room, with three 120kW boilers, a new flue system, an upsized gas main and Trend BMS.
Read the case studyChace Community School
Second floor washrooms stripped out and fully refurbished during the 2024 summer holiday, engaged directly by the school.
Read the case study
£200kSt Mary's, Royston
Hot and cold water services renewed throughout a live school, with a new electric hot water system and air conditioning for the nursery.
Read the case study
£137kGunnersbury Catholic School
Boilers, hot water generator, flues, pumps, plate heat exchanger and Tridium BMS replaced in a live school plant room.
Read the case study
£120kHarrow School Speech Room
Boiler plant serving the listed Speech Room replaced as main contractor, with the historic fabric protected throughout.
Read the case study
Goldsmiths Great Hall
Twelve sectional steel radiators replaced in the Great Hall inside a four-day window before student examinations.
Read the case studyOrley Farm School
Five fire door sets replaced in listed school buildings, with bespoke doors and traditional-style glazed vision panels.
Read the case study
Chase Side Primary School
Boiler plant replaced as principal contractor for the London Borough of Enfield in the five-week summer holiday of 2017.
Read the case studyPublic and Community Buildings 3 projects
£450kGreenhouse Centre
Mechanical, ventilation and controls works for a significant upgrade of the Greenhouse Sports centre ahead of its reopening.
Read the case study
£300kDunmow Community Centre
The complete mechanical and electrical package for a new community centre, built around a ground source heat pump.
Read the case study
£260kEnfield Civic Centre
Replacement and upgrade of the cooling tower installation, with condenser and chilled water pipework, controls and electrical works.
Read the case studyCommercial and Residential Care 2 projects
£500,000Bridgewood House Care Home
A new Daikin VRV air conditioning system with 70 indoor and 12 outdoor units, installed in a fully occupied care home.
Read the case study
£90k30 City Road
Mechanical services for an office fit-out: 12 fan coil units, new ductwork, kitchen extract and domestic water services.
Read the case studyEarlier projects

St Pancras Chambers
Mechanical services modernisation of the penthouse suite in the turreted upper floors. No heat or spark generating tools were allowed, so plumbing went in with press fit fittings, and sectional cold water tanks were rebuilt piece by piece in the plant room.

Blackshots Leisure Centre
An 1100kW boiler, a new sectional cold tank, a fast recovery hot water cylinder and air handling for the pool hall, with the centre kept open throughout.

Lea Bridge Road
Faulty boilers serving 56 flats replaced, with residents kept in heating and hot water on temporary plant for the duration of the works.

Royal Foundation of St Katharine
Boiler, pipework and domestic water replacement at a charity retreat, with heating maintained for the occupants throughout.