Services Sectors Case Studies About Accreditations Areas We Cover Community News Downloads Contact Call us
Home/Case Studies/Greenhouse Centre

Greenhouse Centre, Mechanical, Ventilation and Controls

Mechanical, ventilation and controls works for a significant upgrade of the Greenhouse Sports centre ahead of its reopening.

£450kPublic and Community BuildingsFire-rated ductworkUnder-floor duct routes
Fire-rated ductwork installed beneath the raised floor at the Greenhouse Centre

Overview

We were proud to deliver a comprehensive package of mechanical, ventilation and controls works at the Greenhouse Centre, as part of a significant upgrade to the facility ahead of its reopening.

Scope of works

Our works included the installation of fire-rated ductwork throughout the centre, incorporating specialist grilles and a large Nuaire extract fan. Sections of the ductwork were permanently installed beneath the floor, requiring careful planning and coordination, with dedicated maintenance access hatches incorporated for future serviceability.

We also completed significant alterations to the domestic hot and cold water and heating systems, including new pipework, flushing and dosing, alongside the strip-out and removal of redundant air conditioning systems.

Our specialist works included the supply and installation of motorised smoke and fire dampers, control panels and associated electrical wiring, together with a new BMS to provide effective control and monitoring of the centre's building services. For the new kitchen area, we installed new pipework and a dedicated extract ventilation system and fan.

Project photographs

Fire-rated ductwork installed beneath the raised floor at the Greenhouse Centre
Fire-rated ductwork installed beneath the raised floor at the Greenhouse Centre
The decorated domed ceiling inside the Greenhouse Centre
The decorated domed ceiling inside the Greenhouse Centre

Planning a similar project?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.