Full mechanical and BMS installation for a new community diagnostic centre serving MRI, CT and X-ray, with over ten contract lifts and zero accidents on site.

£4.6 millionHealthcareTwo MRI scan roomsThree new AHUs

Scope of works

Preou was engaged by Ealing Hospital for the £4.6 million installation of a new Community Diagnostic Centre (CDC) department, focusing on key mechanical and BMS services including ventilation, air conditioning, heating, domestic water, water treatment and medical gas systems.

In the MRI department we installed two MRI scan rooms, including MRI chillers, standby chillers, air handling units and quench pipes. Three new air handling units were installed in the Level 4 plant room to serve the Level 1 CDC department, alongside specialised systems for the X-ray and CT departments, domestic services and drainage.

Delivery

Special attention was given to the new MRI and CT scanners, incorporating BMS and oxygen depletion systems. The newly designed BMS will significantly reduce the overall energy consumption of the CDC department.

This was a live hospital campus with complex logistics and stringent clinical safety requirements. Multi-disciplinary coordination maintained access routes and infection control, with areas released in phases.

Outcome

With over ten contract lifts and zero accidents on site, all works adhered to manufacturer guidelines and were completed on time and within budget. Handover included a demonstration of the new facility to the client, ensuring full operational readiness.

Planning a similar project?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.