Mechanical and electrical services contractors based in Billericay, Essex, working across London and the South East since 1961. Boiler house refurbishment, plant replacement and full design and installation, planned around your building staying open.

Plant room strip-out and renewal around live buildings: boilers, pumps, plate heat exchangers, flues, pressurisation and BMS, programmed into school holidays and hospital shutdown windows.
Boiler house refurbishment
LTHW heating, radiators and distribution pipework, air handling units, MVHR and extract systems, from design to commissioning.
Find out more
VRV and VRF systems, split units and fan coil units, installed by F-Gas certified engineers in occupied buildings.
Find out more
Cooling towers, chillers, chilled water pipework and process cooling for MRI and CT, with pressurisation and water treatment.
Find out more
Hot and cold water plant and distribution: water heaters, cylinders, booster sets, UV filtration, chlorination and washroom refurbishment.
Find out more
Gas Safe registered. Gas supplies, pipework alterations, gas safety circuits and boiler plant connections.
Find out more
Temporary heating and hot water plant that keeps a building running while its permanent plant is replaced.
Find out more
Preou FM: tailored planned maintenance for boiler plant, air conditioning, ventilation, water hygiene, BMS and electrical systems.
Find out more
Complete mechanical and electrical packages as main contractor or principal contractor, including builders work, BMS and specialist subcontractors.
Find out moreFire door and compartmentation surveys, design, supply, installation and photographic compliance records.
Find out more
A fast, first-class shutdown service for boiler houses and hot and cold water refurbishment, planned so there is no mechanical downtime in term.
Find out moreNHS Trusts, schools, universities, local authorities and commercial clients across London, Essex and the South East.
Arthur Preou founded the company in 1961, working from his home. He moved the business from residential into commercial engineering, built a strong local authority client base and incorporated in 1964. His daughter Julia Herold joined him in 1982, and his grandson Daniel Herold started on the tools in 2009.
Today Daniel is Managing Director and Julia is Finance Director. Since September 2024 the company has worked from its own offices, warehouse and workshop at Radford Crescent in Billericay, and it has grown by more than 400% under the new leadership.



Full mechanical and BMS installation for a new community diagnostic centre serving MRI, CT and X-ray, with over ten contract lifts and zero accidents on site.
The full mechanical installation for a new 3T MRI suite, phased in a live hospital and completed with zero incidents.

Three plant rooms renewed, a new external plant room built and 30 anti-ligature air conditioning units installed in a fully operational mental health hospital.

A new modular boiler plant in a sub-ground energy centre, delivered with temporary plant and zero operational downtime across the campus.
Education · £650kM&E upgrades and refurbishment of the Tech Block as main contractor and lead designer, with new MVHR and four VRF systems.
Education · £540kTwo plant rooms refurbished and joined into one network by new underground pipework, with the school kept fully operational for six months.
Also: Ashurst Hospital, Northwick Park Hospital, Laurel Park School, Enfield Civic Centre, Harrow School and more.











High standard of workmanship, professionalism, responsiveness. The way they programmed and executed the installations assisted in many ways to the success of the projects.
All work undertaken of a very good quality. Respectful of the hospital trust's ongoing operations and working in a healthcare environment.
A very professional contractor. Their standard of workmanship and project management is excellent.
I have always found this company to be professional in their manner with excellent communication and management skills.
A good quality labour team, well supervised, and showing consideration for the other occupants of the building.
Your guys have done a great and professional job, a credit to your company.
All staff have been excellent and the after service has also been very good.
The team takes part each year in the Lennox golf day, the TEC Supplies charity football cup and the Synonymous Sport boxing night, all in aid of children and families affected by cancer. We have also raised funds for Tusk, the British Heart Foundation, Macmillan and Save the Children.
Read the latest Preou newsletters for recent projects, new members of the team and our charity work. In 2026 we welcomed Martyn Furness as Contracts Manager and Amy Jones to the service department, and celebrated Chris Sullivan's 30 years with the company.
News and newslettersSend us your drawings and specification, or call the office to discuss the programme.
Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.