Services Sectors Case Studies About Accreditations Areas We Cover Community News Downloads Contact Call us

Heating, Ventilation and Air Conditioning Contractors for Hospitals, Schools and Public Buildings

Mechanical and electrical services contractors based in Billericay, Essex, working across London and the South East since 1961. Boiler house refurbishment, plant replacement and full design and installation, planned around your building staying open.

BESA members for over 40 yearsGas Safe · F-Gas · Constructionline Gold · SafeContractor
BESA members for over 40 yearsGas Safe · F-Gas · Constructionline Gold · SafeContractor
BESA, Building Engineering Services Association Gas Safe Register REFCOM F-Gas certificated Constructionline Gold member Alcumus SafeContractor approved SSIP, Safety Schemes in Procurement NHS Shared Business Services Constellia

Mechanical and electrical services, designed and installed by our own engineers

New commercial boilers installed by Preou

Boiler House Refurbishment

Plant room strip-out and renewal around live buildings: boilers, pumps, plate heat exchangers, flues, pressurisation and BMS, programmed into school holidays and hospital shutdown windows.

Boiler house refurbishment
Spiral ventilation ductwork at high level

Heating and Ventilation

LTHW heating, radiators and distribution pipework, air handling units, MVHR and extract systems, from design to commissioning.

Find out more
Air cooled chiller installed by Preou at a London hospital

Air Conditioning

VRV and VRF systems, split units and fan coil units, installed by F-Gas certified engineers in occupied buildings.

Find out more
Rooftop cooling plant with pipework running between the units

Chilled Water and Cooling

Cooling towers, chillers, chilled water pipework and process cooling for MRI and CT, with pressurisation and water treatment.

Find out more
Insulated pipework with temperature gauges in a plant room

Domestic Water Services

Hot and cold water plant and distribution: water heaters, cylinders, booster sets, UV filtration, chlorination and washroom refurbishment.

Find out more
Gas fired boilers installed by Preou

Gas Services

Gas Safe registered. Gas supplies, pipework alterations, gas safety circuits and boiler plant connections.

Find out more
Control panel and plant installed by Preou

Temporary Boiler Plant

Temporary heating and hot water plant that keeps a building running while its permanent plant is replaced.

Find out more
Preou hospital facilities management leaflet showing the building systems that need regular maintenance and compliance checks

Service and Maintenance

Preou FM: tailored planned maintenance for boiler plant, air conditioning, ventilation, water hygiene, BMS and electrical systems.

Find out more
New boiler plant installed by Preou at The Linden Centre

M&E Main Contracting

Complete mechanical and electrical packages as main contractor or principal contractor, including builders work, BMS and specialist subcontractors.

Find out more

Fire Doors and Fire Protection

Fire door and compartmentation surveys, design, supply, installation and photographic compliance records.

Find out more
New boiler plant in the plant room at Hadley Wood Primary School

School Holiday Shutdown Works

A fast, first-class shutdown service for boiler houses and hot and cold water refurbishment, planned so there is no mechanical downtime in term.

Find out more

Sectors we work in

NHS Trusts, schools, universities, local authorities and commercial clients across London, Essex and the South East.

The Preou offices at 8 Radford Crescent, Billericay, with Preou vans parked outside
1961Established

A family business in its third generation

Arthur Preou founded the company in 1961, working from his home. He moved the business from residential into commercial engineering, built a strong local authority client base and incorporated in 1964. His daughter Julia Herold joined him in 1982, and his grandson Daniel Herold started on the tools in 2009.

Today Daniel is Managing Director and Julia is Finance Director. Since September 2024 the company has worked from its own offices, warehouse and workshop at Radford Crescent in Billericay, and it has grown by more than 400% under the new leadership.

1961Trading since
65Years in healthcare and education
40+Years a BESA member
3Generations of one family
Our story and team
Two members of the Preou team shaking hands in front of the Preou logo on a planted wall
Family runThree generations since 1961
The boardroom at Radford Crescent with the Preou logo on a planted wall
Our own facilityOffices, warehouse and workshop
The open plan office at Radford Crescent with a city skyline mural and the Preou logo
Radford CrescentBillericay, since September 2024

Recent case studies

£4.6 million

Ealing Hospital CDC

Healthcare

Full mechanical and BMS installation for a new community diagnostic centre serving MRI, CT and X-ray, with over ten contract lifts and zero accidents on site.

  • Two MRI scan rooms
  • Three new AHUs
  • Medical gases
  • Ten contract lifts, zero accidents
£1.5 million

Charing Cross 3T MRI Suite

Healthcare

The full mechanical installation for a new 3T MRI suite, phased in a live hospital and completed with zero incidents.

  • Air source heat pumps
  • Process cooling
  • Quench pipe
  • Zero incidents
Outdoor plant on the roof at Charing Cross Hospital
£800k

The Linden Centre

Healthcare

Three plant rooms renewed, a new external plant room built and 30 anti-ligature air conditioning units installed in a fully operational mental health hospital.

  • Main contractor
  • Three plant rooms renewed
  • 30 anti-ligature AC units
  • New BMS
New boiler plant in a plant room at The Linden Centre
All 32 case studies

Also: Ashurst Hospital, Northwick Park Hospital, Laurel Park School, Enfield Civic Centre, Harrow School and more.

Trusted by NHS trusts, councils and universities

Client testimonials

High standard of workmanship, professionalism, responsiveness. The way they programmed and executed the installations assisted in many ways to the success of the projects.
ClientVarious projects in Redbridge
All work undertaken of a very good quality. Respectful of the hospital trust's ongoing operations and working in a healthcare environment.
ClientKing George's Hospital boiler installation
A very professional contractor. Their standard of workmanship and project management is excellent.
ClientSchool heating projects in Hackney
I have always found this company to be professional in their manner with excellent communication and management skills.
ClientSchool heating projects in Newham
A good quality labour team, well supervised, and showing consideration for the other occupants of the building.
ClientLeisure centre chiller installation
Your guys have done a great and professional job, a credit to your company.
ClientMile End Hospital pipework refurbishment
All staff have been excellent and the after service has also been very good.
ClientSt Botolph without Bishopsgate Church boiler installation

Proud supporters of the Lennox Children's Cancer Fund

The team takes part each year in the Lennox golf day, the TEC Supplies charity football cup and the Synonymous Sport boxing night, all in aid of children and families affected by cancer. We have also raised funds for Tusk, the British Heart Foundation, Macmillan and Save the Children.

  • Lennox Children's Cancer Fund
  • Tusk
  • British Heart Foundation
  • Macmillan
  • Save the Children
Preou in the community

Latest news from Preou

Read the latest Preou newsletters for recent projects, new members of the team and our charity work. In 2026 we welcomed Martyn Furness as Contracts Manager and Amy Jones to the service department, and celebrated Chris Sullivan's 30 years with the company.

News and newsletters

Planning a plant room refurbishment?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.