Services Sectors Case Studies About Accreditations Areas We Cover Community News Downloads Contact Call us
Home/Case Studies/Goldsmiths Energy Centre

Goldsmiths, University of London, Energy Centre Upgrade

A new modular boiler plant in a sub-ground energy centre, delivered with temporary plant and zero operational downtime across the campus.

£1.1 millionEducationModular boiler plantTemporary boiler plant
The main building at Goldsmiths, University of London

Overview

Preou completed a full energy centre upgrade at Goldsmiths, University of London, in New Cross, as part of the institution's infrastructure modernisation programme. The project involved the design, installation and commissioning of a new modular boiler plant within the lower ground floor energy centre. The new high-efficiency LTHW system has significantly improved energy performance, resilience and compliance across the campus.

Live campus delivery

A key challenge was maintaining continuous heating and hot water during the works. Preou provided a temporary boiler plant to ensure full service continuity, avoiding any disruption to academic, residential and critical buildings.

Working in a sub-ground floor plant room added complexity, requiring the removal of a ground floor louvre, specialist crane operations and careful removal and installation of plant equipment in sections.

Scope and integration

Preou managed the full turnkey delivery, including the safe removal of the legacy LTHW system and the mechanical design of the new modular plant. The installation integrated LTHW networks, natural gas, cold water mains, drainage, a compliant flue system, electrical systems and full BMS control. Final commissioning and performance testing ensured the system met all regulatory and operational standards.

Outcome

The project was delivered with zero operational downtime, enhancing energy efficiency, system resilience and control through advanced BMS integration. The result is a future-proof energy centre with improved serviceability, supporting the university's long-term sustainability goals.

Project photographs

The main building at Goldsmiths, University of London
The main building at Goldsmiths, University of London

Planning a similar project?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.