Minster in Sheppey, Heating Installation

An outdated one-pipe heating system removed across the Upper and Lower Schools and replaced in an eight-week programme, with heat on in time for winter.

Education8 week programme95 new radiators
One of the school buildings at Minster in Sheppey

Overview

We undertook a comprehensive heating system upgrade at Minster in Sheppey, involving the full removal of the outdated one-pipe heating system and radiators across both the Upper and Lower Schools. The project was delivered within an eight-week programme and achieved the critical target of providing treated heat in time for the start of winter.

Scope of works

A total of 95 new radiators and complete new pipework were installed throughout both school buildings. In the Upper School, the new heating system was integrated with the existing three boilers. The plant room was significantly upgraded with new pipework, a pressurisation unit, a plate heat exchanger, new primary and secondary pumps, and modified Trend controls to accommodate the new installation.

In the Lower School, the boiler room was completely stripped and refitted with two new high-efficiency boilers, a dosing pot, and new pumps and pipework. Both heating systems were fully flushed, chemically treated and commissioned.

Outcome

All exposed pipework was boxed in as part of the builders work to enhance safety and prevent pupils from coming into contact with hot surfaces. The project was delivered on time, with heating fully operational by the scheduled date.

In addition to the main contract, we carried out responsive repairs to other school boilers, including the replacement of heat exchangers and ancillary components, working directly with school management to minimise disruption.

Project photographs

One of the school buildings at Minster in Sheppey
One of the school buildings at Minster in Sheppey
Minster in Sheppey Primary School entrance
Minster in Sheppey Primary School entrance

Planning a similar project?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.