The Linden Centre, Plant Room Construction
Builders works for a new external plant room at a mental health facility, built to house new mechanical and heating equipment and secured with mesh fencing and a lockable gate.

Overview
The project at The Linden Centre involved the delivery of builders works for the construction of a new external plant room, designed to accommodate new mechanical and heating equipment.
Scope of works
The scope of works included site preparation, concrete base works, traditional brickwork construction, flat roofing, fascia installation and the fitting of ventilated double access doors. The building was constructed to provide a durable and weather-resistant enclosure, with provisions for mechanical services and roof-level flue penetrations.
Patient safety and security
As The Linden Centre is a mental health facility, patient safety and security were key considerations. Heavy-duty metal mesh security fencing was installed around the plant room, incorporating a lockable access gate to prevent unauthorised access to the building and potentially hazardous equipment, whilst maintaining access for authorised maintenance personnel.
The project also required careful consideration of existing gas services, surrounding buildings and the restricted working area. The construction and mechanical installations needed to be coordinated to ensure the plant room was suitable for its intended purpose.
Outcome
The completed works provided a secure, functional and durable plant room, addressing the specific requirements of a mental health environment. This project demonstrates our ability to deliver high-quality builders works within sensitive healthcare settings, with particular attention to safety, security and workmanship. The plant room formed part of our wider mechanical and electrical infrastructure upgrade at The Linden Centre.
Project photographs



Related case studies
Ealing Hospital CDC
Full mechanical and BMS installation for a new community diagnostic centre serving MRI, CT and X-ray, with over ten contract lifts and zero accidents on site.
Read the case study
£1.5 millionCharing Cross 3T MRI Suite
The full mechanical installation for a new 3T MRI suite, phased in a live hospital and completed with zero incidents.
Read the case study
£1.1 millionAshurst Hospital
A comprehensive mechanical and electrical services upgrade as main contractor for University Hospital Southampton NHS Foundation Trust.
Read the case studyPlanning a similar project?