The Linden Centre, M&E Infrastructure Upgrade
Three plant rooms renewed, a new external plant room built and 30 anti-ligature air conditioning units installed in a fully operational mental health hospital.

Overview
We were appointed as main contractor to deliver a significant programme of mechanical and electrical infrastructure upgrades at The Linden Centre, working within a fully operational mental health hospital.
Scope of works
The project included the complete strip-out and renewal of three existing plant rooms, alongside the construction of a new external plant room specifically designed to house the new mechanical plant and equipment.
Our works also incorporated major upgrades to the heating manifold and distribution infrastructure throughout the facility, together with the installation of a new Building Management System (BMS) to improve control and monitoring.
We also installed 30 new air conditioning units throughout the facility. Due to the nature of the environment, these installations required specialist anti-ligature solutions, with careful consideration given to positioning, accessibility and patient safety.
Delivery
As main contractor we were responsible for the complete management and coordination of the project, including site welfare, health and safety, site rules, programme management and specialist subcontractors.
Working within a live mental health hospital required particularly stringent safeguarding procedures. Hospital policies and strict working protocols were followed throughout to protect patients, facilities staff, visitors and our engineers.
Project photographs


Related case studies
Ealing Hospital CDC
Full mechanical and BMS installation for a new community diagnostic centre serving MRI, CT and X-ray, with over ten contract lifts and zero accidents on site.
Read the case study
£1.5 millionCharing Cross 3T MRI Suite
The full mechanical installation for a new 3T MRI suite, phased in a live hospital and completed with zero incidents.
Read the case study
£1.1 millionAshurst Hospital
A comprehensive mechanical and electrical services upgrade as main contractor for University Hospital Southampton NHS Foundation Trust.