St Claudine's Catholic School for Girls, Fire Door Replacement
A comprehensive fire door replacement programme, from survey and design through manufacture and installation to digital compliance records.

Overview
Preou delivered a comprehensive fire door replacement programme at St Claudine's Catholic School for Girls over the six-week summer holiday, covering the project from initial survey and design through to manufacture, installation and compliance documentation.
Scope of works
Our scope included the site survey and door assessment, the design and specification of replacement fire door sets, manufacture and supply, installation of doors, frames and ironmongery, and OneTrace digital compliance records.
Delivery
Working within a live school environment, the programme was carefully coordinated to minimise disruption to staff and pupils. OneTrace provided photographic evidence at key stages of each installation, creating a clear digital record to support fire safety compliance, future inspections and ongoing maintenance.
Project photographs

Related case studies

Minster in Sheppey Schools
An outdated one-pipe heating system removed across the Upper and Lower Schools and replaced in an eight-week programme, with heat on in time for winter.
Read the case study
£1.1 millionGoldsmiths Energy Centre
A new modular boiler plant in a sub-ground energy centre, delivered with temporary plant and zero operational downtime across the campus.
Read the case studyGrove Road School
Heating and mains hot and cold water systems replaced across three school buildings during the holidays, on time and within budget.
Read the case studyPlanning a similar project?
Send us your drawings and specification, or call the office to discuss the programme.