Goldsmiths, University of London, Great Hall Radiators

Twelve sectional steel radiators replaced in the Great Hall inside a four-day window before student examinations.

EducationFour day window12 sectional steel radiators
The Great Hall at Goldsmiths set out with examination desks

The brief

Goldsmiths required a fast-track heating upgrade in their Great Hall. The project involved the installation of 12 sectional steel radiators within an extremely tight four-day window. The hall had to be fully operational immediately after the works, as it was scheduled to host student exams.

Delivery

The Preou team coordinated closely with the university to schedule the works during a short access period. Materials were pre-checked and delivered in advance, and a dedicated team was assigned to work continuously across the four days. Our engineers managed the safe removal of old equipment, installation of the new radiators, and full testing and commissioning.

Outcome

The project was completed on time, with the Great Hall returned to the university fully heated and ready for use.

Project photographs

The Great Hall at Goldsmiths set out with examination desks
The Great Hall at Goldsmiths set out with examination desks

Planning a similar project?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.