Chase Side Primary School, Boiler Replacement

Boiler plant replaced as principal contractor for the London Borough of Enfield in the five-week summer holiday of 2017.

EducationLondon Borough of EnfieldPrincipal contractor
Three new wall-hung boilers on a rig at Chase Side Primary School

Overview

Chase Side Primary School is a community school in the London Borough of Enfield. We have completed many contracts for this borough across a wide variety of schools and council buildings. Here we were appointed as principal contractor to carry out the boiler replacement.

Scope of works

We removed the existing hot water plant and associated equipment, including boilers, flues, pumps, redundant controls and heating pipework. We supplied and installed three new boilers on a rig with all accessories and new flues to serve the existing distribution system, adapted pipework to suit the new plant room layout and replaced the distribution pumps.

The works also included modifications to the existing cold mains water services with a new pressurisation unit, gas services, a new drainage system, new power and controls cabling, all associated building works and making good, and the flushing, sterilisation, venting, testing and commissioning of the new heating system.

Delivery

Our main challenge was to complete the works on schedule, with only the summer holiday available before the school community returned. The project commenced on 14 August 2017 and was completed on 15 September 2017. All directly employed staff are DBS checked, and we take the health and safety of employees, subcontractors, teaching staff, pupils and visitors extremely seriously.

Project photographs

Three new wall-hung boilers on a rig at Chase Side Primary School
Three new wall-hung boilers on a rig at Chase Side Primary School
New plant room pipework at Chase Side Primary School
New plant room pipework at Chase Side Primary School

Planning a similar project?

Send us your drawings and specification, or call the office to discuss the programme.

Get in touch with Preou HVAC Ltd

Tell us about the building and the plant, and a member of the team will come back to you to discuss the project in detail.

TelephoneCall us
Email 
Office8 Radford Crescent, Billericay, Essex CM12 0DU

Key contacts

  • Daniel Herold, Managing Director
  • Julia Herold, Finance Director
  • Charles Romero, Business Development

Start a project

Send drawings, a specification or a description of the plant. We reply within one working day.

We reply within one working day.