Gunnersbury Catholic School, Boiler Plant Room Upgrade
Boilers, hot water generator, flues, pumps, plate heat exchanger and Tridium BMS replaced in a live school plant room.

Project overview
We were appointed to undertake comprehensive boiler plant room upgrade works at Gunnersbury Catholic School. The project involved the replacement and modification of key mechanical and control systems to improve efficiency, reliability and compliance with current regulations. All works were carefully coordinated to minimise disruption within the live school environment.
Scope of works
The works commenced with modification of the existing gas services to suit the new boiler layout. A new gas safety circuit was installed, incorporating electro-thermal devices and a gas solenoid valve.
We replaced one domestic hot water services generator, including associated valves, pumps and ancillaries. Two gas-fired boilers were replaced along with all associated valves and ancillaries, and two new boiler flues were installed.
The project also included the replacement and installation of heating pumps, pressurisation units, expansion vessels and associated components, and a new plate heat exchanger. A full review of the existing boiler room ventilation was undertaken to confirm adequacy for the proposed installation.
Controls
A new Tridium BMS controls system and control panel were installed. All pipework, valves and ancillaries were thermally insulated and clearly identified in accordance with current standards. Electrical wiring and containment were completed as part of the project, which concluded with full testing and commissioning.
Project photographs

Related case studies

Minster in Sheppey Schools
An outdated one-pipe heating system removed across the Upper and Lower Schools and replaced in an eight-week programme, with heat on in time for winter.
Read the case study
£1.1 millionGoldsmiths Energy Centre
A new modular boiler plant in a sub-ground energy centre, delivered with temporary plant and zero operational downtime across the campus.
Read the case studyGrove Road School
Heating and mains hot and cold water systems replaced across three school buildings during the holidays, on time and within budget.
Read the case studyPlanning a similar project?
Send us your drawings and specification, or call the office to discuss the programme.