Outline of works; Installation of replacement cold water storage tanks

The London Borough of Redbridge contracted us to replace the existing hot & cold water service risers along with the cold water storage tanks at the Ilford Lane Council Chambers. This incorporated removing all associated pipework and services, including the existing hot water system within the boiler room.

We then had to install the new hot and cold water service risers throughout the building, reconnecting and modifying the existing pipework, and electrically wiring and commissioning the new installations. We also had to install new cold water storage cisterns, comprising of GRP sectional tanks. Supports, brackets and a purpose made upstand. While this was going on, we had to install temporary electric water heaters to serve the first and third floor kitchens, safely navigating the equipment through tight hallways and staircases.