Woodford Green Preparatory School

We carry out many boiler replacement contracts in the school holidays. This school had been suffering from a lack of heating and hot water.

 

Our job was to rationalise the old plant rooms to one central plant area. We installed a high efficiency dual Broag boiler system, complete with new pipe work and controls, and a high recovery un-vented hot water generating system.

The new heating mains were installed very quickly using the Gruvlok pipe jointing system. The pumps we used were inverter controlled. We worked alongside Builders who were extending the building. Our works were such that the school remained open. Again the works were completed on time and within budget.